Project Diary

 

 

The following document contains my project Diary notes created during the completion of my DiDA Project.

 

 

Monday 1st October          

Introductory lesson about beginning DiDA Project. We are told we should create a project diary to monitor our progress. Rest of the lesson was discussing various way of planning a project.

 

Wednesday 3rd October

I began creating a task list and breaking down tasks into sub tasks. Trying to use colour to make things easier to understand. Think I may try and create a Gantt chart.

 

Friday 5th October

I am still mainly doing task list, but started my Gantt chart and am scheduled to finish on Monday.

 

Monday 8th October

Gantt chart taking longer than I thought. Didn’t get it tested or finished today. Still early days. Don’t think research will take me as long as I have planned so can make up time.

 

Wed 10th October

I am not enjoying the Gantt chart. Have become very confused with all the different colours I used. Teacher suggested simplifying it and using a key. Looks better, but will still need a bit more work.

 

Fri 12th October-Mon 15th

I was off sick, but managed to get Gantt chart finished as homework. Did some Internet research while I was ill. Had an ear infection, but had to spend lots of time in bed. Used my Dad’s laptop to do some research when I felt well enough.

 

Wed 17th October

Now back at school. A lot of people have already started their projects. I got some testers for my Gantt chart and conducted more research. Feedback suggested my Gantt chart was too complicated. However, my teacher thinks it is really good. Besides I’ve seen other people’s plans and some of them are rubbish, just big lists of tasks in a Word doc. I reckon mine looks much more professional so I am not going to change it.

Teacher also took us through a revision session of database skills, as some of us will be going to start this soon. Looks easy enough.

 

Fri 19th October

Planning and starting letter. Way behind schedule, but I’m on holiday soon. I reckon I can do letter on my home PC in about an hour. No worries.

 

Mon 29th October

Back at school, started survey. I am now 100% back on schedule as I finished my letter over the holidays. Didn’t take long at all. Mail merge is easy – you just follow wizard.

 

Mon 5th November

Have been creating questions and spreadsheet. Have conducted a few surveys already. Seems to be going ok.

 

Wed 7th November

Conducted loads of surveys during lunch and after school. Reckon I have enough now. Going to start adding results.

 

Fri 9th November

Results added analysis done, going to carry on and finish survey report rather than go onto database. Finding that using formulas isn’t as hard as I thought.

 

Wed 14th November

Finished all survey tasks and have written up the document. Starting database on Friday

 

Fri 16th
Created database ok. Need to add data. Having trouble working out validation rules.

 

Wed 21st

Database becoming complicated. Have added 5 new entries, but am stuck trying to work out what to do with my test users. Have tried a few different approaches but had to scrap them as they didn’t work.

 

Fri 23rd
Discussed with teacher why my database was so rubbish. He said I was trying to create a relational database. He gave me some advice but said he couldn’t directly help me finish it. I have worked out a way to salvage what I have done.

 

Mon 26th November

Database is done and dusted. Will do reports for 5 test users later.

 

Wed 28th November

Working on Information Point. I’m way behind schedule. Can save files onto memory stick and work on information point at home though.

 

 

 

 

Fri 7th December

Finished Information Point. It is really good. Lots of impressive feedback from test users. Going to do database reports in class and do some leaflet work at home. If I do the leaflet in MS publisher I can transfer files between my home and school computer.

 

Fri 14th December

Test user activity reports finishes. Have storyboarded my leaflets. Need to do some image editing work in class, but have most of my text planned and written. Shouldn’t take too long.

 

Wed 19th December

Finished leaflet and it looks great. Can start review. No too much behind schedule. Can relax over Christmas holidays.

 

Mon 7th January

Review writing is not very exciting. Need to tie up lots of loose ends. Have started thinking about structure of my e-portfolio. Will probably have to work on e-portfolio and review simultaneously.

 

Fri 11th January

Due to have finished review but can’t totally finish review without creating e-portfolio. Have started a few test pages and have written some commentaries.

 

Wed 16th January
Reckon I have written as much of the review as I can for the moment. Going to crack on with E-portfolio design and page building. Quite like the web work, it’s a welcome change from writing a review.

 

Monday 28th January

E-portfolio coming along ok, but have to go back and tidy up documents and commentaries. Think I will be ok, but only two weeks left

 

Wed 6th Feb

E-portfolio looking ok, but need graphics and permissions. Not sure if I’ll finish before half term. Went back and wrote more of review. Have tested links for pages so far. Seems to all work ok. Keep thinking of extra features I should add in like a site map and accessibility options. Don’t know if there is time

 

Mon 11th of Feb

Final week and getting lots of testing done, but still have to spend time testing other peoples’ e-portfolio as well. I am doing lots of writing at home so I can concentrate on all the web bits in class. Nearly finished though.

 

Wed 13th Feb

Think it is all done. Final files were uploaded today. Including this project diary. Need to do testing, proofing and checks for the rest of the week.